Cross-discipline design-contradiction checker for construction drawing sets. Standalone tool broken out from Iron_Bid; a pipeline stage may later fold back into Iron_Bid. Pipeline: PDF->images -> per-sheet assertion extraction -> deterministic clustering by location -> per-cluster reasoning -> report. Includes CLI (cli/run_check.py) and web UI (backend/main.py). Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
1 line
1.1 KiB
JSON
1 line
1.1 KiB
JSON
{"conflicts": [{"conflict_id": "rtu_curb_height_discrepancy_01", "category": "note_or_spec_contradiction", "severity": "medium", "confidence": "high", "location": "Roof Curb for new RTUs at Grid B-C/4-5", "disciplines": ["Architectural", "Mechanical"], "sheets": ["M01.01", "A25.01"], "description": "The mechanical schedule on M01.01 specifies a 14-inch high roof curb for the new RTUs. The architectural roof curb detail on A25.01 contains conflicting information: one note states '14\" HIGH PER IECC & MFR'S REQ.' which is consistent, but another note in the same detail says to 'Nominate 1'0\"' (12 inches). This ambiguity will cause confusion for bidding and installation, potentially impacting waterproofing and structural coordination.", "evidence": [{"discipline": "Mechanical", "sheet": "M01.01", "source_text": "9. PROVIDE 14\" HIGH INSULATED ROOF CURB.", "asserted_value": "14 inches"}, {"discipline": "Architectural", "sheet": "A25.01", "source_text": "Nominate 1'0\" for P.Con.", "asserted_value": "12 inches"}], "recommended_resolution": "coordinate drawings"}]} |