Files
Conflict_Checker/backend/.llm_cache/58daffa7606ccf1318c9cd8ecea502578cdf78dce18dfd6e218ba4423f136c01.json
woogiandClaude Opus 4.8 1d248a8808 Initial commit: Conflict Checker
Cross-discipline design-contradiction checker for construction drawing
sets. Standalone tool broken out from Iron_Bid; a pipeline stage may
later fold back into Iron_Bid.

Pipeline: PDF->images -> per-sheet assertion extraction -> deterministic
clustering by location -> per-cluster reasoning -> report.
Includes CLI (cli/run_check.py) and web UI (backend/main.py).

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-07-03 00:22:02 +00:00

1 line
1.2 KiB
JSON

{"conflicts": [{"conflict_id": "room_102_name_inconsistency_01", "category": "tag_or_reference_inconsistency", "severity": "low", "confidence": "high", "location": "Women's Restroom 102", "disciplines": ["General", "Architectural", "Electrical", "Plumbing"], "sheets": ["G21.01", "A51.01", "E03.01", "P02.01"], "description": "The women's restroom is labeled inconsistently across the drawing set. It is identified as 'WOMEN'S RESTROOM', 'WOMEN'S / RESTROOM', a generic 'RESTROOM', and 'WOMEN'S ROOM' on various plans. While the intent is clear, this inconsistency can lead to confusion during documentation, submittals, and RFIs. All drawings should be updated to use a single, consistent name for this room, preferably 'WOMEN'S RESTROOM 102'.", "evidence": [{"discipline": "General", "sheet": "G21.01", "source_text": "WOMEN'S RESTROOM", "asserted_value": "WOMEN'S RESTROOM"}, {"discipline": "Electrical", "sheet": "E03.01", "source_text": "RESTROOM", "asserted_value": "RESTROOM"}, {"discipline": "Architectural", "sheet": "A51.01", "source_text": "WOMEN'S / RESTROOM", "asserted_value": "WOMEN'S / RESTROOM"}, {"discipline": "Plumbing", "sheet": "P02.01", "source_text": "WOMEN'S ROOM", "asserted_value": "WOMEN'S ROOM"}], "recommended_resolution": "coordinate drawings"}]}